DISCLAIMER
Every reasonable effort has been made to ensure the accuracy of the information provided; nevertheless, some information may not be accurate. Confirmation is recommended as there may be errors in the database.


Neighborhood Lookup: Eastside: Milpas: Pending and Approved Projects

View Case Status

Case Number: MST2018-00682 Status: Application has been Submitted, no Final Action to-date
Application Date: 12/21/2018
Description: Proposal for a remodel of an existing commercial shopping center. Project consists of a fašade remodel including new colors, copper gutters, sandstone bases, and extended eaves. A new 33 foot tall entry tower is proposed for a new grocery store location. A reallocation of non-residential floor area is proposed with demolition of a 1,697 square foot mezzanine and construction of a 606 square foot loading dock. Also proposed are changes to parking lot circulation and configuration, new landscaping and site lighting, and storm water management improvements. Project requires a Minor Zoning Exception for an increase in building height within the north interior setback. An application for the removal of two street trees, a Metrosideros Excelsa and Ficus Benjamina, has been submitted for review by the City's Parks and Recreation Department.
Address: 29 S MILPAS ST

Reverse Sorted by Completed Date

Case Activities

Type Completed
ABR-Resubmittal Received 2/11/2019
Prelim Plan Check - Transp 1/28/2019
Prelim Plan Check - Creeks 1/24/2019
ABR-Resubmittal Received 1/23/2019
Prelim Plan Check - Zoning 1/18/2019
ABR-Posting Sign Issued 12/21/2018
Application Received 12/21/2018

Back Print this Page Top of Page