Neighborhood Lookup: Downtown: Oak Park: Pending and Approved Projects

View Case Status

Case Number: MST2018-00171 Status: A Planning Commission Approval Has Occurred for this Submittal, Design Review is still Required
Application Date: 3/29/2018
Description: Proposal for additions and alterations to an existing 887 square foot single residential unit with a detached 198 square foot one-car garage. The project includes demolition of the existing one-car garage, and construction of a new 463 square foot detached two-car garage. Other site improvements include a first-story addition of 462 square feet, a new second-story addition of 567 square feet and a new 323 square foot basement. The proposed total of 2,380 square feet of development on a 6,460 square foot lot is 85% of the maximum allowable floor-to-lot area ratio (FAR). Staff Hearing Officer Review is requested to allow for reduced Open Yard area requirements.
Address: 2315 CHAPALA ST

Reverse Sorted by Completed Date

Case Activities

Type Completed
SHO-APVD-Design Review Req'd 2/27/2019
SHO-Public Hearing (Continued) 2/27/2019
SHO-Tentative SHO Hearing Date 2/27/2019
SHO-Reconsideration Item 1/31/2019
SHO-Reconsideration Item 1/29/2019
SHO-Tentative SHO Hearing Date 1/16/2019
SHO-APVD-Design Review Req'd 1/16/2019
SHO-Public Hearing (New) 1/16/2019
SHO-Project Deemed Complete 12/3/2018
Prelim Plan Check - Zoning 9/11/2018
Prelim Plan Check - Transp 9/11/2018
SFDB-NoticePrepared-PC/SHO Req 7/23/2018
SFDB-Concept Review (New) - PH 7/23/2018
HLC-FYI/Research 7/2/2018
HLC-Historic Structures Report 6/27/2018
HLC-Hist. Struc. Rpt Accepted 6/27/2018
HLC-FYI/Research 6/21/2018
HLC-Resubmittal Received 5/16/2018
(F) Print Prelim Plan Check 4/10/2018
Prelim Plan Check - Creeks 4/10/2018
Prelim Plan Check - Transp 4/5/2018
Prelim Plan Check - Zoning 4/3/2018
HLC-Posting Sign Issued 3/29/2018
Application Received 3/29/2018
ENV-MEA Prepared-action req  
SHO-Non-DART Received  
(F) Design Review Routing  
(F) Design Review Routing  
SHO-Non-DART Received  