View Case Status

Case Number: MST2007-00559 Status: A Planning Commission Approval Has Occurred for this Submittal, Design Review is still Required
Application Date: 11/6/2007
Description: The project has been revised in response to concerns expressed by the City Council at the December 8, 2009 appeal hearing. The project consists of the demolition of an existing 392 square foot single-family residence, and the construction of a sustainable, 4,320 square foot, three-story, mixed-use building. The proposal will result in two residential condominiums and two commercial condominiums, with an on-grade parking structure, including 6 parking spaces. Bicycle parking and a changing room are provided within the garage structure. The residential units are 1,257 square foot, two-bedroom, and three-story units at the rear of the lot. The commercial units total 958 square feet and are located on the first and second floor adjacent to the street. The proposal includes 2,015 square feet of green roof and upper level landscape plantings.
Address: 617 BRADBURY AVE

Reverse Sorted by Completed Date

Case Activities

Type Completed
SHO-Time Extension Hearing 5/23/2018
PW Engineering Comments 1/27/2018
SHO-Time Extension APVD 6/7/2017
SHO-Time Extension 6/7/2017
SHO-Tentative SHO Hearing Date 6/7/2017
SHO-Tentative SHO Hearing Date 12/7/2016
SHO-APVD-Design Review Req'd 12/7/2016
SHO-Time Extension 12/7/2016
SHO-Time Extension Requested 3/2/2016
ABR-FYI/Research 1/5/2016
ABR-Final Approval - Project 12/21/2015
ABR-Consent (Final Review) 12/21/2015
ABR-Correspondence/Contact 12/14/2015
ABR-Consent (Final Review) 12/14/2015
ABR-Resubmittal Received 12/2/2015
Prelim Plan Check - Creeks 12/1/2015
ABR-Resubmittal Received 11/25/2015
ABR-Correspondence/Contact 8/26/2015
Prelim Plan Check - Transp 8/26/2015
Prelim Plan Check - Zoning 8/26/2015
ABR-Correspondence/Contact 8/21/2015
ABR-Correspondence/Contact 8/18/2015
Prelim Plan Check - Creeks 8/12/2015
ABR-Resubmittal Received 8/11/2015
ABR-Correspondence/Contact 8/11/2015
ABR-Correspondence/Contact 6/29/2015
SHO-Case Planner Status 4/20/2015
SHO-Correspondence/Contact 5/6/2013
Oops! Still "PA" Status 12/17/2010
ABR-Project Design - Details 12/6/2010
ABR-Consent (Continued) 12/6/2010
ABR-Prelim Approval - Project 11/29/2010
ABR-Preliminary Review Hearing 11/29/2010
CC-HLC Appeal (Proj APVD) 5/25/2010
ABR-Concept Review (Continued) 3/22/2010
ABR-Resubmittal Received 3/1/2010
ABR-Mailed Notice Prepared 2/8/2010
ABR-Concept Review (Continued) 2/8/2010
ABR-Resubmittal Received 1/29/2010
CC-PC Appeal (Continued) 12/8/2009
CC-SHO PC Appeal Filed 12/8/2009
READ THIS NOTE! 12/1/2009
ABR-FYI/Research 10/13/2009
PC-SHO Appeal (Proj DENY) 9/17/2009
PC-Tentative PC Hearing Date 9/17/2009
PC-Appeal Hearing 9/17/2009
PC-SHO Appeal Filed 9/17/2009
ABR-FYI/Research 8/3/2009
ABR-Preliminary Review Hearing 7/27/2009
SHO-DART Appeal Filed 7/25/2009
ABR-Resubmittal Received 7/20/2009
SHO-Tentative SHO Hearing Date 7/15/2009
SHO-APVD-Design Review Req'd 7/15/2009
SHO-Public Hearing (Continued) 7/15/2009
ABR-Concept Review (Continued) 6/29/2009
ABR-Resubmittal Received 6/23/2009
ABR-FYI/Research 6/23/2009
SHO-Public Hearing (New) 6/17/2009
SHO-Tentative SHO Hearing Date 6/17/2009
ABR-Concept Review (Continued) 3/23/2009
ABR-Resubmittal Received 3/17/2009
PBW Eng DART #3 Comments 3/16/2009
ABR-FYI/Research 3/16/2009
ABR-FYI/Research 3/16/2009
BLD DART #3 Draft Comments 3/10/2009
SHO-Project Revised 2/27/2009
ABR-Concept Review (Continued) 2/23/2009
ABR-Resubmittal Received 1/30/2009
ABR-Notice Prepared-PC/SHO Req 12/1/2008
ABR-Concept Review (Continued) 12/1/2008
ABR-Resubmittal Received 10/22/2008
SHO-Correspondence/Contact 10/21/2008
HLC-Archaeology Rpt Accepted 7/9/2008
ENV-Req'd Information Accepted 7/9/2008
HLC-Archaeology Report 7/9/2008
ABR-Concept Review (Continued) 6/30/2008
BLD DART #2 Draft Comments 6/30/2008
ENV-Arch. Report Rec'd/Routed 6/10/2008
ABR-Resubmittal Received 6/10/2008
PBW Eng DART #1 Comments 4/7/2008
BLD DART #1 Draft Comments 4/7/2008
ABR-Notice Prepared-PC/SHO Req 2/11/2008
ABR-Concept Review (New) - PH 2/11/2008
ABR-Posting Sign Issued 1/31/2008
ABR-Resubmittal Received 1/2/2008
Parks & Rec Comments 11/28/2007
Prelim Plan Check - Zoning 11/14/2007
(F) Print HALT Prelim PlanCk 11/14/2007
Project HALTED 11/14/2007
(F) Print HALT Prelim PlanCk 11/14/2007
Application Received 11/6/2007
SHO-DART Incomplete  
SHO-DART Received  
SHO-DART Incomplete  
SHO-DART Received  
SHO-DART Received  
PC-DART Received  